Requirements Modeling set 7

Que: 62. Which of the following statements about SRS is/are true ?i. SRS is written by customerii. SRS is written by a developeriii. SRS serves as a contract between customer and developer
a. Only i is true
b. Both ii and iii are true
c. All are true
d. None is true
Que: 63. The SRS document is also known as _____________ specification.
a. black-box
b. white-box
c. grey-box
d. blue-box
Que: 64. Which of the following is included in SRS ?
a. Cost
b. Design Constraints
c. Staffing
d. Delivery Schedule
Que: 65. Which of the following is not included in SRS ?
a. Performance
b. Functionality
c. Design solutions
d. External Interfaces
Que: 66. Arrange the given sequence to form a SRS Prototype outline as per IEEE SRS Standard.i. General descriptionii. Introductioniii. Indexiv. Appendicesv. Specific Requirements
a. iii, i, ii,v, iv
b. iii, ii, i, v, iv
c. ii, i, v, iv, iii
d. None of the above
Que: 67. Consider the following Statement: “The output of a program shall be given within 10secs of event X 10% of the time.”What characteristic of SRS is being depicted here ?
a. Consistent
b. Verifiable
c. Non-verifiable
d. Correct
Que: 68. Consider the following Statement: “The data set will contain an end of file character.”What characteristic of SRS is being depicted here ?
a. Consistent
b. Non-verifiable
c. Correct
d. Ambiguous
Que: 69. Consider the following Statement: “The product should have a good human interface.”What characteristic of SRS is being depicted here ?
a. Consistent
b. Non-Verifiable
c. Correct
d. Ambiguous
Que: 70. Which two requirements are given priority during Requirement Management of a product ?
a. User and Developer
b. Functional and Non-functional
c. Enduring and Volatile
d. None of the these
Que: 71. Why is Requirements Management Important ? It is due to the changes
a. to the environment
b. in technology
c. in customer’s expectations
d. in all of the mentioned